Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wpmagplus-companion domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/xig97bhch3d1/public_html/wp-includes/functions.php on line 6121
What to Do When Your Real Property Report Is Rejected by the City - eWriterForYou - Best Guest Posting Site

What to Do When Your Real Property Report Is Rejected by the City

When dealing with property transactions or permit applications in Edmonton, a Real Property Report (RPR) is often required. It’s a detailed legal document prepared by a land surveyor that outlines the structures, improvements, and boundaries of a property. Municipalities like Edmonton review these RPRs to ensure everything on your property complies with zoning regulations and building codes.

But what happens when your RPR gets rejected by the city? It’s more common than many property owners think—and when it happens, it can delay sales, halt construction, or even put deals at risk. Here’s what to do if your RPR in Edmonton doesn’t pass municipal review.

1. Understand Why It Was Rejected

The first step is to get clarity on the reason for the rejection. The City of Edmonton will usually provide written comments or a list of deficiencies. Common issues include:

  • Non-compliant structures. Sheds, decks, fences, or garages that were built too close to property lines or within setbacks.
  • Missing improvements. If the RPR doesn’t show recent additions or modifications to the property.
  • Outdated RPR. If your RPR was done before new structures were added or if it’s too old, the city may require a current version.
  • Part of your building or a structure might cross into a utility right-of-way or neighbouring property.

It’s essential to understand whether the issue is with the report itself or with what’s on the ground.

2. Contact a Professional Surveyor Immediately

If your RPR has been rejected, you’ll need to connect with a professional land surveyor to update or revise the document. If there were recent additions like a deck, shed, or garage, the updated RPR in Edmonton must reflect these.

Sometimes, it’s a simple matter of updating measurements or re-submitting with clearer documentation. Other times, the surveyor may need to return to the property and conduct a new survey.

3. Address the Underlying Issue on the Property

If the rejection was due to zoning violations or encroachments, you may have some tough decisions to make:

  • Apply for a variance. If a structure is slightly outside the required boundaries, you can apply for a zoning variance from the city. This legal exemption, if granted, allows the structure to remain.
  • Remove or relocate the structure. In some cases, you may have to physically move or dismantle part of the structure—especially if it violates easement rights or creates a safety concern.
  • Encroachment agreements. If part of a structure crosses into a right-of-way or city property, the city may allow it to remain under an encroachment agreement. This is a formal contract with the municipality that acknowledges the situation and outlines legal use.

4. Keep All Documentation Organized

When resolving a rejected RPR in Edmonton, documentation is everything. Keep records of all city correspondence, contractor invoices, permits, survey updates, and legal agreements. This will not only protect you in future transactions but also speed up the compliance process.

5. Re-Submit for Compliance

Once your surveyor has updated the RPR and you’ve addressed any compliance issues, you can resubmit your report to the city. Make sure to include:

  • The updated RPR
  • Any new permits or approvals (e.g., variances or encroachment agreements)
  • A letter explaining what has been changed or corrected

The city’s compliance department will review the resubmission and either approve it or issue further comments.

By being proactive and responsive, you can turn a rejected report into a compliant one—and keep your project or property deal moving forward.

Leave a Reply

Your email address will not be published. Required fields are marked *

Busniess

How Microscopes for Kids Inspire Young Scientists

There’s something magical about the first time a child peers through a microscope. A simple droplet of water can suddenly reveal a bustling world they never even knew existed. That moment of surprise and delight often becomes the spark that nudges a young mind towards scientific curiosity. Microscopes for kids make this kind of discovery […]

Read More
Busniess

The Everpure H104 Filter System and What Makes It Stand Out

The Everpure H104 filter system is a popular choice for homeowners who want cleaner, better tasting water directly from their kitchen taps. It is known for its consistent performance, long service life, and user friendly design. As part of Everpure’s respected under sink filtration lineup, the H104 brings restaurant grade water quality into the home […]

Read More
Busniess

Two Basic Upgrades You Can Make to Your Unicycle

Fortunately, unicycles are simple machines with relatively few parts, as machines go. This makes them easy to maintain and makes it (relatively) easy to understand their operation. It also means that when it comes to upgrades, you’re somewhat limited in what you can do. The flipside of this is that effectively anyone with a working […]

Read More